CUES AMP Case Study

PIPC was brought in to map the newly installed HDD due to a leak under the North Branch of the Potomac River.


AMP Gyroscopic Mapping Technology

AMP Gyroscopic Mapping Technology Request

If outside of the US and Canada, please enter Country
TC Energy HDD Plan & ProfileTC Energy HDD Plan & Profile

PROJECT

A distribution gas line was needed to be replaced with a newly installed HDD, due to a leak under the North Branch of the Potomac River.

SOLUTION

PIPC was brought in to map the newly installed HDD and was able to perform the mapping with the Accurate Mapping Probe (AMP – Gyroscopic mapping).

PIPC was successful in mapping this HDD for TC Energy in under 4 hours with deliverables supplied in less than 24-hours.