PIPC was brought in to map the newly installed HDD due to a leak under the North Branch of the Potomac River.
AMP Gyroscopic Mapping Technology
TC Energy HDD Plan & Profile |
PROJECT
A distribution gas line was needed to be replaced with a newly installed HDD, due to a leak under the North Branch of the Potomac River.
SOLUTION
PIPC was brought in to map the newly installed HDD and was able to perform the mapping with the Accurate Mapping Probe (AMP – Gyroscopic mapping).
PIPC was successful in mapping this HDD for TC Energy in under 4 hours with deliverables supplied in less than 24-hours.