
3/15/23
Condition Assessment Special Report
CUES’ GraniteNet Pipeline Inspection/Condition Assessment Software is featured in the latest Trenchless Technology Special Report on Condition Assessment.
READ MORE >>CUES is proud to introduce the new LAMP II launcher storage drawer/Power Boom crane deployment system. The system features a storage location engineered specifically for the LAMP II lateral launcher paired with a CUES exclusive Power Boom crane engineered to provide efficient manhole deployment/retrieval of the LAMP II lateral launcher. To read more about the features and benefits, click below.